An import workflow had stopped after losing its reference files. We recovered the data from a backup and added checks before processing, together with recovery steps for operations that could not complete.

By ESolutionMediaPublished Anonymised case study

The context

The existing system processed exports from an assessment platform and prepared files for an administrative system. A separate tool regenerated the reference data used during processing. The two components therefore relied on shared information while serving different purposes.

The problem

The regeneration tool had been started without the required input file. It moved existing data into an archive but did not produce valid replacements. Subsequent processing could no longer match reference records. Retrying the import did not address the cause: the data it depended on was missing.

Our contribution

How the work was checked

The intervention package documents the recovered files and the change to the regeneration tool. We explicitly distinguished the modified component from the processing pipeline that consumed its data. This makes the contribution traceable and avoids attributing unrelated changes to our work.

What this means for similar projects

Reference data is part of an integration’s operating logic. Checking inputs before replacing existing data and providing a recovery path matter as much as transforming the file itself. These dependencies are also a starting point when we assess a workflow for automation.